LiDAR-first scan-to-twin pipeline · the geometric layer of your industrial digital twin.
Your digital twin is only as accurate as its geometric foundation. We scan your brownfield plant in 7-10 days, register the point cloud to survey-grade accuracy, classify it into asset categories, and hand it over digital twin-ready · cutting digital twin foundation work by 4-6 months.
The biggest reason digital twin programmes slip is the geometric foundation · the as-built 3D model. CAD models are 15 years out of date. Hand-measured surveys take 6 months and are full of errors. Photogrammetry doesn't have the accuracy. LiDAR is the only foundation that scales · 1 mm accuracy, captured at 100,000 m² per day, automatically registered, ready to ingest into your asset platform. We've done this 20+ times for digital twin programmes feeding into AVEVA, Bentley, AspenTech, Hexagon Smart3D, and digital twin. The geometric foundation, done right, lets every other layer (asset register, condition monitoring, predictive maintenance, AR/VR training) build on solid ground.
CEng MIE India-signed deliverables · LiDAR-powered where applicable · digital twin handover ready · routes to the 3D LiDAR Scanning practice lead within 24 hours.
Scan locations planned for optimum coverage. Permanent ground control points established for long-term re-scan accuracy.
Leica RTC360 + BLK360 + RTC360 trolley + drone-mounted LiDAR (where appropriate). 100,000 m² per day typical brownfield throughput. Hot-work-safe protocols.
Cyclone REGISTER 360 cloud-to-cloud + survey control registration. Survey-grade accuracy verification (1-2 mm). Coverage gap audit.
Automated classification (piping / structure / equipment / cable trays). Manual QC. Output formats: E57, RCS, ReCap, IFC, or digital twin-native handover.
Direct push to digital twin platform if digital twin is your destination. Otherwise: handover schema documented for your asset platform of choice.
Reports reference the international and national standards your regulators, F500 audit teams, and corporate process safety leads cite. Every deliverable signed by a Chartered Engineer (CEng MIE India).
Three landmark engagements from our verified roster · quantified outcomes, no client names disclosed without written permission.
Scanned 80,000 m² refinery in 8 calendar days during live operation. Registered to 1.8 mm accuracy. Handed over digital twin-native. Twin programme advanced by 5 months.
Cleanroom + utility scan with GMP-validated documentation chain. Foundation for AVEVA digital twin.
Hot-work-safe scan during operations. Foundation enabled remote maintenance planning · field exposure reduced 60%.
Tell us your plant, region, and scope · a named Chartered Engineer responds within 24 hours.