Risk + Safety + AMC
HAZOP · QRA · LOPA · SIL · Arc Flash AMC · IEC 61508 aligned functional safety practice from Chartered Engineers who have signed off 800+ risk assessments across oil & gas, pharma, steel and power.
Process hazard analysis (HAZOP / LOPA per IEC 61882). Functional safety verification (SIL per IEC 61511). Quantitative Risk Assessment. Arc Flash AMC with 5-year recertification retainer per NFPA 70E + IEEE 1584. Where contractor governance is in scope, sister platform Zentry provides the workforce and access-governance layer · gate-side induction, attendance evidence, and CLRA + Schedule M audit trails · so the safety practice we sign for at the drawing board becomes the safety practice enforced at the plant gate. Same-day callback for compliance deadlines.
VB Engineering delivers Risk + Safety + Arc Flash AMC from Hyderabad HQ + Houston/Katy practice teams. HAZOP + LOPA per IEC 61882 + 61511 Part 3. SIL assessments per IEC 61511. Quantitative Risk Assessment with consequence modelling + ALARP demonstration. 5-year Arc Flash AMC retainer per NFPA 70E + IEEE 1584. Country-native overlays · ADNOC SAES + Aramco SAES + UAE Fire Code + AS/NZS 4801 + SS 506 + K3 Migas + HSE 1989 + GB Standards. Every deliverable named Chartered Engineer signed.
Risk + Safety + Arc Flash AMC discipline · across 21 countries · CEng MIE signed.
Risk + Safety + Arc Flash AMC runs the international standards stack with country-native regulatory overlays applied per jurisdiction.
Hazard and operability study guide. Applied across refineries, petrochem, pharma, and steel plants. PESO + DGFASLI + OSHA + ADNOC SAES overlays.
Functional safety for the process industry SIS. LOPA-supported SIL target verification. ISA TR84 reference framework. Cross-walked for jurisdiction-specific deliverables.
Standard for Electrical Safety in the Workplace + Guide for Performing Arc Flash Hazard Calculations. Applied on every Arc Flash AMC retainer.
OSHA Process Safety Management + EPA Risk Management Program. Applied across US refineries + petrochem + chemical. Cross-walked with PESO + ADNOC + DGFASLI.
API building siting + portable buildings + risk-based inspection. Cross-walked with ALARP demonstration for international deliverables.
Chartered Engineer + Professional Engineer signature accepted across India, US, GCC, AU, SEA, UK jurisdictions. Practice Lead direct sign-off on 5-year AMC retainers.
The Risk + Safety + Arc Flash AMC discipline broken into distinct deliverables. Productized for repeatability across 21-country footprint.
IEC 61882 hazard and operability studies. Process plant + refinery + petrochem + pharma applicable. Multilingual node tracking where required. PESO / OSHA / ADNOC SAES overlays.
IEC 61511 functional safety verification on SIS architectures. LOPA-supported SIL target verification. ISA TR84 reference framework. PFD avg + risk reduction factor verification.
Quantitative Risk Assessment. Frequency analysis + consequence modelling + ALARP demonstration. EPA RMP 40 CFR 68 + API RP 752 + 753 + 581 cross-walked.
IEC 61511 Part 3 facilitated LOPA workshops. Independent Protection Layer (IPL) credit verification. OSHA PSM + ADNOC SAES vendor approval compatible.
NFPA 70E + IEEE 1584 5-year recertification retainer. Year 1 initial study + Years 2-5 quarterly site walk-throughs + annual study refresh + signage refresh. CEng / PE signed annual.
Real engagements from the Risk + Safety + Arc Flash AMC practice · F500 anchor accounts · CEng / PE signed.
HAZOP refresh on FCC + Crude + Coker + Hydrotreater units. NFPA 70E + IEEE 1584 arc flash study locked into a 5-year AMC retainer. OSHA 1910.119 PSM aligned. PE Texas + CEng dual signature.
Plant-wide HAZOP. SIL assessment on the SIS architecture. QRA on ammonia + oxygen storage. ALARP demonstration. DGFASLI factory inspection compatible. CEng MIE FIE signature.
HAZOP refresh on FCC unit + adjacent process blocks. SIL assessment on 12 safety functions. ADNOC SAES vendor approval framework. Arabic-English bilingual node tracking. CEng UAE-licensed signature.
Country-native Risk + Safety + Arc Flash AMC pages with jurisdiction-specific standards, regulators, and case studies. Pick your geography.
Primary: IEC 61511 (SIL), IEC 61882 (HAZOP / LOPA), NFPA 70E + IEEE 1584 (Arc Flash). Regulatory overlays: OSHA 1910.119 + EPA RMP for US; ADNOC SAES + UAE Fire Code for UAE; Aramco SAES + SCE for KSA; Qatar Energy + KAHRAMAA for Qatar; AS/NZS + AusIMM for AU; SS 506 for Singapore; PUIL 2011 + K3 Migas for Indonesia; HSE 1989 + COMAH for UK; GB Standards for China; PESO + DGFASLI + CEA + BIS for India.
Initial NFPA 70E + IEEE 1584 study delivered Year 1. Quarterly site walk-throughs in Years 2-5. Annual study refresh + signage refresh. Coverage of new equipment additions. Country-native overlays applied. CEng / PE signed every annual refresh. Tier 1 priority routing for AMC-flagged engagements.
Same-day callback for compliance-deadline-driven enquiries. Within 24 hours a named CEng MIE or PE Texas is on the line. 45-minute discovery call. Joint scoping document within 72 hours. Full engineering proposal within 7 calendar days.
Yes. Arabic-English bilingual where required (UAE, KSA, Qatar). Mandarin Chinese-English (China). Bahasa Indonesia-English (Indonesia). Hindi-English (India where requested). Other languages on request.
Risk + Safety engagements often bundle with PSS Arc Flash on the same plant · single engagement, single Principal Reviewer signature. Native handover to Wistwin · the sister Industry 4.0 platform · for safety case digital archival + continuous monitoring.
Tell us what you need · a named Chartered Engineer responds within 24 hours.