Risk + Safety + AMC

Find the risk. Fire the ESD. Contain the loss.

HAZOP · QRA · LOPA · SIL · Arc Flash AMC · IEC 61508 aligned functional safety practice from Chartered Engineers who have signed off 800+ risk assessments across oil & gas, pharma, steel and power.

Modelled in · HAZOP · QRA · LOPA · SIL
Simulation running
T + 04:12
VESSEL V-101 · 42 barg
GAS LEAK DETECTED
ESD-1 ACTIVE
SIL Rating
3.0IEC 61508
▲ Verified
Response Time
180ms
▼ target 250 ms
HAZOP Nodes
147closed
▲ Batch complete
RISK + SAFETY + ARC FLASH AMC

Risk + Safety + AMC. HAZOP, SIL, QRA, LOPA, Arc Flash.

Process hazard analysis (HAZOP / LOPA per IEC 61882). Functional safety verification (SIL per IEC 61511). Quantitative Risk Assessment. Arc Flash AMC with 5-year recertification retainer per NFPA 70E + IEEE 1584. Where contractor governance is in scope, sister platform Zentry provides the workforce and access-governance layer · gate-side induction, attendance evidence, and CLRA + Schedule M audit trails · so the safety practice we sign for at the drawing board becomes the safety practice enforced at the plant gate. Same-day callback for compliance deadlines.

VB Engineering delivers Risk + Safety + Arc Flash AMC from Hyderabad HQ + Houston/Katy practice teams. HAZOP + LOPA per IEC 61882 + 61511 Part 3. SIL assessments per IEC 61511. Quantitative Risk Assessment with consequence modelling + ALARP demonstration. 5-year Arc Flash AMC retainer per NFPA 70E + IEEE 1584. Country-native overlays · ADNOC SAES + Aramco SAES + UAE Fire Code + AS/NZS 4801 + SS 506 + K3 Migas + HSE 1989 + GB Standards. Every deliverable named Chartered Engineer signed.

F500 anchor accounts · verified roster
25 marquee operators across 21 countries trust VB Engineering.
Bayer
Pfizer
TATA
Adani
JSW
Nestle
ISRO
Mahindra
Siemens
Bosch
DuPont
Aditya Birla
Hindalco
Amazon
Indian Oil
ITC
Asian Paints
Dr. Reddy
Kia
Bureau Veritas
Lloyd
Halliburton
Jindal Steel
AMNS
Rolls Royce
Bayer
Pfizer
TATA
Adani
JSW
Nestle
ISRO
Mahindra
Siemens
Bosch
DuPont
Aditya Birla
Hindalco
Amazon
Indian Oil
ITC
Asian Paints
Dr. Reddy
Kia
Bureau Veritas
Lloyd
Halliburton
Jindal Steel
AMNS
Rolls Royce

VB Engineering · at a glance

Risk + Safety + Arc Flash AMC discipline · across 21 countries · CEng MIE signed.

500+
HAZOP / SIL Engagements
Across 21 countries · 12 years
50+
5-year AMC Retainers
Recurring recertification partnerships
100%
ALARP Demonstrated
Capex-committee + regulator defensible
Same-day
Callback for Compliance Deadlines
Practice Lead direct

The codes that govern every Risk + Safety + Arc Flash AMC engagement.

Risk + Safety + Arc Flash AMC runs the international standards stack with country-native regulatory overlays applied per jurisdiction.

Process Hazard Analysis
IEC 61882

Hazard and operability study guide. Applied across refineries, petrochem, pharma, and steel plants. PESO + DGFASLI + OSHA + ADNOC SAES overlays.

Functional Safety
IEC 61511

Functional safety for the process industry SIS. LOPA-supported SIL target verification. ISA TR84 reference framework. Cross-walked for jurisdiction-specific deliverables.

Arc Flash
NFPA 70E + IEEE 1584

Standard for Electrical Safety in the Workplace + Guide for Performing Arc Flash Hazard Calculations. Applied on every Arc Flash AMC retainer.

Process Safety Management
OSHA 1910.119 + EPA RMP

OSHA Process Safety Management + EPA Risk Management Program. Applied across US refineries + petrochem + chemical. Cross-walked with PESO + ADNOC + DGFASLI.

Quantitative Risk
API RP 752 + 753 + 581

API building siting + portable buildings + risk-based inspection. Cross-walked with ALARP demonstration for international deliverables.

Sign-Off
CEng MIE + PE Texas + Practice Lead

Chartered Engineer + Professional Engineer signature accepted across India, US, GCC, AU, SEA, UK jurisdictions. Practice Lead direct sign-off on 5-year AMC retainers.

Risk + Safety + Arc Flash AMC deliverables. Productized.

The Risk + Safety + Arc Flash AMC discipline broken into distinct deliverables. Productized for repeatability across 21-country footprint.

Deliverable 01

HAZOP Studies

IEC 61882 hazard and operability studies. Process plant + refinery + petrochem + pharma applicable. Multilingual node tracking where required. PESO / OSHA / ADNOC SAES overlays.

Deliverable 02

SIL Assessments

IEC 61511 functional safety verification on SIS architectures. LOPA-supported SIL target verification. ISA TR84 reference framework. PFD avg + risk reduction factor verification.

Deliverable 03

QRA Studies

Quantitative Risk Assessment. Frequency analysis + consequence modelling + ALARP demonstration. EPA RMP 40 CFR 68 + API RP 752 + 753 + 581 cross-walked.

Deliverable 04

LOPA Workshops

IEC 61511 Part 3 facilitated LOPA workshops. Independent Protection Layer (IPL) credit verification. OSHA PSM + ADNOC SAES vendor approval compatible.

Deliverable 05

5-Year Arc Flash AMC

NFPA 70E + IEEE 1584 5-year recertification retainer. Year 1 initial study + Years 2-5 quarterly site walk-throughs + annual study refresh + signage refresh. CEng / PE signed annual.

Sub-services · the full inventory

Every risk safety amc deliverable. One signature.

Risk Safety Amc · Sub-service

Arc Flash + Safety AMC (5-Year Retainer)

Explore the deliverables, standards, deliverable formats.
Risk Safety Amc · Sub-service

Bow-Tie + ALARP Analysis

Explore the deliverables, standards, deliverable formats.
Risk Safety Amc · Sub-service

FMEA / FMECA Studies

Explore the deliverables, standards, deliverable formats.
Risk Safety Amc · Sub-service

Functional Safety IEC 61508 Assessment

Explore the deliverables, standards, deliverable formats.
Risk Safety Amc · Sub-service

HAZOP Study

Explore the deliverables, standards, deliverable formats.
Risk Safety Amc · Sub-service

Layer of Protection Analysis (LOPA)

Explore the deliverables, standards, deliverable formats.
Risk Safety Amc · Sub-service

Mechanical Asset Integrity Programmes

Explore the deliverables, standards, deliverable formats.
Risk Safety Amc · Sub-service

Permit-to-Work Systems

Explore the deliverables, standards, deliverable formats.
Risk Safety Amc · Sub-service

QRA Study

Explore the deliverables, standards, deliverable formats.
Risk Safety Amc · Sub-service

SIL Determination + SIS Design

Explore the deliverables, standards, deliverable formats.

Three Risk + Safety + Arc Flash AMC projects. Landmark by NDA.

Real engagements from the Risk + Safety + Arc Flash AMC practice · F500 anchor accounts · CEng / PE signed.

Case 01 · Gulf Coast Refinery HAZOP + AMC

F500 refinery operator · Gulf Coast

HAZOP refresh on FCC + Crude + Coker + Hydrotreater units. NFPA 70E + IEEE 1584 arc flash study locked into a 5-year AMC retainer. OSHA 1910.119 PSM aligned. PE Texas + CEng dual signature.

Case 02 · Steel Plant SIL + QRA

JSW-tier integrated steel plant · Karnataka belt

Plant-wide HAZOP. SIL assessment on the SIS architecture. QRA on ammonia + oxygen storage. ALARP demonstration. DGFASLI factory inspection compatible. CEng MIE FIE signature.

Case 03 · UAE Tier-1 Refinery HAZOP + SIL

F500 refinery operator · Ruwais zone

HAZOP refresh on FCC unit + adjacent process blocks. SIL assessment on 12 safety functions. ADNOC SAES vendor approval framework. Arabic-English bilingual node tracking. CEng UAE-licensed signature.

Operating in 10 strategic hubs.

Country-native Risk + Safety + Arc Flash AMC pages with jurisdiction-specific standards, regulators, and case studies. Pick your geography.

Common questions about Risk + Safety + Arc Flash AMC.

Which standards do you engineer to?

Primary: IEC 61511 (SIL), IEC 61882 (HAZOP / LOPA), NFPA 70E + IEEE 1584 (Arc Flash). Regulatory overlays: OSHA 1910.119 + EPA RMP for US; ADNOC SAES + UAE Fire Code for UAE; Aramco SAES + SCE for KSA; Qatar Energy + KAHRAMAA for Qatar; AS/NZS + AusIMM for AU; SS 506 for Singapore; PUIL 2011 + K3 Migas for Indonesia; HSE 1989 + COMAH for UK; GB Standards for China; PESO + DGFASLI + CEA + BIS for India.

How does the 5-year Arc Flash AMC retainer work?

Initial NFPA 70E + IEEE 1584 study delivered Year 1. Quarterly site walk-throughs in Years 2-5. Annual study refresh + signage refresh. Coverage of new equipment additions. Country-native overlays applied. CEng / PE signed every annual refresh. Tier 1 priority routing for AMC-flagged engagements.

How fast do you respond to compliance-deadline-driven enquiries?

Same-day callback for compliance-deadline-driven enquiries. Within 24 hours a named CEng MIE or PE Texas is on the line. 45-minute discovery call. Joint scoping document within 72 hours. Full engineering proposal within 7 calendar days.

Do you facilitate HAZOP workshops in multiple languages?

Yes. Arabic-English bilingual where required (UAE, KSA, Qatar). Mandarin Chinese-English (China). Bahasa Indonesia-English (Indonesia). Hindi-English (India where requested). Other languages on request.

How does Risk + Safety bundle with PSS and Wistwin?

Risk + Safety engagements often bundle with PSS Arc Flash on the same plant · single engagement, single Principal Reviewer signature. Native handover to Wistwin · the sister Industry 4.0 platform · for safety case digital archival + continuous monitoring.

Scope your Risk + Safety + AMC engagement.

Tell us what you need · a named Chartered Engineer responds within 24 hours.

  • 4 fields. No phone interview.
  • Multi-select by studies: HAZOP / LOPA, SIL, QRA, Arc Flash + NFPA 70E, 5-year AMC retainer.
  • landmark the region engagements sent with first reply.
  • Same-day callback for compliance-deadline-driven enquiries.

Risk + Safety + AMC Scoping

Routes to Risk + Safety Practice Lead · multi-select scoping by study type · same-day callback for compliance-deadline-driven enquiries.