Verified physical asset register sourced from LiDAR scan + on-site tag plate readings.
Your SAP PM master is 15 years stale. Half the tags don't exist anymore, half the physical assets aren't in the system. We rebuild it from the LiDAR scan + on-site tag plate verification · every pump, motor, transformer, vessel, instrument captured with its actual nameplate data and accurate location.
Predictive maintenance, ESG emissions reporting, mass-balance accounting · all of these assume your asset master in SAP PM / Maximo / Infor / Asset Suite is accurate. It isn't. Brownfield plants typically have 25-40% inaccuracy in their EAM master · ghost tags (in the system but removed from field), missing tags (in field but never added), wrong nameplate data, wrong locations. Rebuilding it manually takes 18-24 months. We do it in 8-12 weeks via LiDAR + field tag verification, hand it over to your EAM in CSV / IDoc / API format, ready to load.
CEng MIE India-signed deliverables · LiDAR-powered where applicable · digital twin handover ready · routes to the 3D LiDAR Scanning practice lead within 24 hours.
Point cloud classified into asset categories. Each asset extracted as a geometric primitive with location + tag-plate face flagged for capture.
Field crew with tablets photographs every tag plate, captures nameplate data via OCR + manual verification, links to point cloud asset ID.
Captured data reconciled against your existing EAM master. Ghosts identified, missing tags added, nameplate corrections flagged.
Output to SAP PM (IDoc / LSMW), Maximo (CSV / REST API), Infor EAM, IBM Asset Suite, or Wistwin-native asset register.
Final reconciled asset register signed by CEng MIE India. Governance protocol delivered to keep it current as your plant changes.
Reports reference the international and national standards your regulators, F500 audit teams, and corporate process safety leads cite. Every deliverable signed by a Chartered Engineer (CEng MIE India).
Three landmark engagements from our verified roster · quantified outcomes, no client names disclosed without written permission.
Rebuilt SAP PM master for 14,800 equipment items. Found 32% discrepancy with field reality. Predictive maintenance programme restarted on clean data.
GMP-validated asset register for cleanroom + utility equipment. Loaded into Blue Mountain RAM. Audit pass.
Migration from legacy CMMS to Infor EAM. LiDAR-verified asset register avoided 18-month data cleanup cycle.
Tell us your plant, region, and scope · a named Chartered Engineer responds within 24 hours.