New design clashed against LiDAR as-built · before steel arrives on site.
Your designer's BIM model assumes the 1998 as-built drawings are accurate. They're not. The new piping clashes with the existing cable tray that was added in 2014 but never drafted. We catch it in clash detection · before six-figure fabricated pipe cost arrives on site.
Brownfield retrofits routinely run 8-15% over budget on rework · field-fitted modifications because designed systems hit obstacles that weren't on the drawings. LiDAR-based clash detection compares your new design (in Revit, SmartPlant, AVEVA E3D, or AutoCAD Plant 3D) against the actual scanned reality. Every interference is caught in design review, not at the steel-up. Pharma cleanroom retrofits, refinery unit revamps, data centre electrical room expansions · we run clash detection on every one we touch.
CEng MIE India-signed deliverables · LiDAR-powered where applicable · digital twin handover ready · routes to the 3D LiDAR Scanning practice lead within 24 hours.
If as-built point cloud isn't already on hand: scan the impacted area at scan throughput rates.
Your design model (Revit / SmartPlant / E3D / AutoCAD Plant 3D / IFC) loaded into Navisworks or Trimble RealWorks. Aligned to scan via control points.
Hard clashes (steel hits pipe), soft clashes (clearance violation), workflow clashes (access path obstruction). Ranked by cost-to-resolve-in-field.
Joint review with your designers · each clash assigned a resolver, route alternative documented. Re-clashed after design update.
Final clash-free design certification. Outstanding clashes flagged with risk register. CEng MIE-signed.
Reports reference the international and national standards your regulators, F500 audit teams, and corporate process safety leads cite. Every deliverable signed by a Chartered Engineer (CEng MIE India).
Three landmark engagements from our verified roster · quantified outcomes, no client names disclosed without written permission.
Scanned 12,000 m² unit. Caught 187 clashes pre-construction. Field rework cost avoided estimated eight-figure.
BIM vs scan caught HVAC duct routing through structural beam · re-routed in design. GMP commissioning preserved.
Cable tray routing clashed with chilled water risers. Caught in design review · saved 6 weeks of construction delay.
Tell us your plant, region, and scope · a named Chartered Engineer responds within 24 hours.