Selective tripping, relay grading, and TCC curve optimisation.
Every fault cleared at the closest upstream device. Nothing more. Time-current characteristic curves graded to IEEE 242 (Buff Book), relay settings delivered ready to load, coordination margins verified by simulation. The smallest possible outage on the worst day.
A bus fault should trip a feeder breaker · not the main incomer that takes the whole plant offline. Mis-coordination is the difference between a 20-minute outage on one feeder and a 6-hour outage that takes the entire plant black. Plants that have grown over decades almost always have inherited mis-coordination · new feeders added without re-grading, relay settings copied from the previous plant, time-overcurrent characteristics overlapping. A protection coordination study isolates these, optimises settings to IEEE 242 grading margins, and delivers settings ready for your protection team to load.
CEng MIE India-signed deliverables · LiDAR-powered where applicable · digital twin handover ready · routes to the Power System Studies practice lead within 24 hours.
Every relay, fuse, MCCB, and breaker captured · make, model, current settings, firmware version. Existing TCC curves digitised.
ETAP or DigSILENT Star/StarZ module used to plot TCC curves and verify coordination margins at every fault location.
Settings re-graded to IEEE 242 margins (0.3-0.4 sec between adjacent devices). Instantaneous pickup thresholds optimised against the short-circuit study output.
Every fault scenario from the short-circuit study cross-checked against the proposed settings. Mis-coordination flagged and resolved iteratively.
Per-relay settings sheets delivered in CSV + PDF. Compatible with SEL, ABB REF/RET, Siemens 7SJ/7SA, GE Multilin loading. Report CEng MIE-signed.
Reports reference the international and national standards your regulators, F500 audit teams, and corporate process safety leads cite. Every deliverable signed by a Chartered Engineer (CEng MIE India).
Three landmark engagements from our verified roster · quantified outcomes, no client names disclosed without written permission.
Inherited mis-coordination from 3 phases of plant expansion. Re-graded 89 relays. Reduced incomer trip events from 14/year to 0 in the next operating year.
GMP audit flagged inadequate protection documentation. Delivered settings sheets + coordination report + TCC curves. Audit closed in 4 weeks.
AS 1768 grading for underground MV distribution. Re-graded for new battery-electric haul fleet load profile.
Tell us your plant, region, and scope · a named Chartered Engineer responds within 24 hours.