Risk + Safety + AMC

Arc Flash + Safety AMC (5-Year Retainer)

Five-year retainer covering NFPA 70E recertification + Safety AMC re-validation.

Arc flash labels expire every 5 years per NFPA 70E. SIL re-validation every 5 years per IEC 61511. HAZOP refresh every 5 years per industry practice. We bundle them into a single 5-year safety AMC · annual touchpoints, quarterly reviews, single CEng MIE-signed retainer. The cleanest compliance assurance contract you'll see.

25 marquee operators · 21 countries · verified roster
Bayer · Pfizer · TATA · Adani · JSW · ISRO · Siemens · Bosch · DuPont · Mahindra · Hindalco · and others
Bayer
Pfizer
TATA
Adani
JSW
Nestle
ISRO
Mahindra
Siemens
Bosch
DuPont
Aditya Birla
Hindalco
Amazon
Indian Oil
ITC
Asian Paints
Dr. Reddy
Kia
Bureau Veritas
Lloyd
Halliburton
Jindal Steel
AMNS
Rolls Royce
Bayer
Pfizer
TATA
Adani
JSW
Nestle
ISRO
Mahindra
Siemens
Bosch
DuPont
Aditya Birla
Hindalco
Amazon
Indian Oil
ITC
Asian Paints
Dr. Reddy
Kia
Bureau Veritas
Lloyd
Halliburton
Jindal Steel
AMNS
Rolls Royce
Why this matters

Why bundled 5-year safety AMC beats unbundled compliance procurement

Brownfield plants run on a calendar of expiring compliance · arc flash labels every 5 years, SIL re-validation every 5 years, HAZOP refresh every 5 years, fire protection audits annually, EHS audits per regulatory cycle. Most plants procure each in silos · different consultants, different methodologies, no continuity. The bundled 5-year Safety AMC delivers all of them on one schedule, one team, one accountability · with quarterly touchpoints to keep the recommendation register current and a single CEng MIE sign-off for the entire safety compliance chain. Plants in our roster have switched to this pattern and report 35-50% lower total cost of safety compliance, plus dramatically lower audit anxiety.

Method

How we deliver Arc Flash + Safety AMC (5-Year Retainer)

CEng MIE India-signed deliverables · LiDAR-powered where applicable · digital twin handover ready · routes to the Risk + Safety + AMC practice lead within 24 hours.

01

Year 0 · baseline

Current state baseline established · NFPA 70E status, SIL register state, HAZOP recommendation closure rate, EHS audit gaps.

02

Annual touchpoints

Annual NFPA 70E recertification (or partial · per change of state). Annual SIL re-validation for a tranche of safety functions. Annual EHS audit. Annual recommendation register review.

03

5-year major reviews

Year 5 · full NFPA 70E recertification + complete SIL re-validation + HAZOP refresh + full audit cycle. Renewed for next 5 years.

04

Quarterly governance reviews

Quarterly recommendation register review with site safety committee. Open / closed item tracking. Escalation of stalled items.

05

On-call event support

Within scope · incident investigation support, MOC-triggered re-HAZOP scope decisions, regulatory inspection support.

Standards + compliance

Built to the standards your auditors quote

Reports reference the international and national standards your regulators, F500 audit teams, and corporate process safety leads cite. Every deliverable signed by a Chartered Engineer (CEng MIE India).

Anonymous case anchors

What this looks like in production

Three landmark engagements from our verified roster · quantified outcomes, no client names disclosed without written permission.

Refinery, India · 5-year safety AMC year-3

Year-3 of 5-year AMC. Cumulative cost 38% below baseline unbundled procurement. Audit-pass rate 100%. Recommendation closure 87%.

Petrochem, KSA · multi-site retainer

3-site Saudi petrochem · combined 5-year AMC. Single team, consistent methodology, lower TCO.

Pharma, USA · combined NFPA + GMP

Bundled NFPA 70E + GMP safety chain. Single audit-ready evidence package. FDA inspection passed without findings on safety chain.

Frequently asked

Arc Flash + Safety AMC (5-Year Retainer) · the practical questions

What's included in the 5-year retainer?
NFPA 70E re-validation (annual partial, full at year 5), SIL re-validation tranches (annual), HAZOP refresh (year 5 or MOC-triggered), annual EHS audit, quarterly governance review, recommendation tracking, on-call MOC + incident support. Itemised in proposal.
What's NOT included?
Major retrofit engineering (separate scope), incident response (on-call only · we engage but bill incident-specific), training delivery beyond annual refresher, third-party certification audits (we support, but the certifier is independent).
Can we use you for some pieces and others for the rest?
Yes · we routinely deliver just one or two pieces (e.g. arc flash + SIL re-val) while another consultant holds HAZOP. The bundled pricing benefit reduces but not eliminates.
How is pricing structured?
Annual fee · split fixed (governance) + variable (per-deliverable). Aligned to your plant size + risk profile + multi-site scope. Indicative retainer on request · single brownfield plant, less per-site for multi-site bundling.
What's the link to Wistwin?
Increasingly delivered via Wistwin as the compliance management platform · live recommendation register, automated re-certification tracking, evidence pack export for audits. This is where the safety AMC and digital twin converge · safety becomes data-driven instead of paper-driven.

Scope your Arc Flash + Safety AMC (5-Year Retainer) engagement.

Tell us your plant, region, and scope · a named Chartered Engineer responds within 24 hours.

  • 4 fields. No phone interview to start.
  • Per-discipline routing to the Risk + Safety + AMC practice lead.
  • Anonymous case anchors sent with first reply.
  • Same-day callback for deadline-driven enquiries.

Risk + Safety + AMC Scoping

HAZOP/LOPA/SIL/QRA · 5-year AMC retainer · Practice Lead Safety responds in 24 hr.

Watch · from our studio

See it in motion.

Electrical Arc Flash Study Consultancy · VB Engineering video thumbnail
The Arc Flash Study consultancy · what you get and why it matters
What is Arc Flash Labeling and How to Print Arc Flash Labels · VB Engineering video thumbnail
What is arc flash labeling · how VB engineered labels are printed and installed