Semi-quantitative risk evaluation of safeguard adequacy.
HAZOP identifies the deviation. LOPA quantifies whether the existing safeguards reduce the risk to tolerable. Where they don't · the gap is the Safety Integrity Level (SIL) required for the Safety Instrumented System. IEC 61511 compliant. The foundation for SIS design.
A HAZOP finding · 'high temperature in reactor R-101 leads to runaway exotherm' · doesn't automatically tell you whether the existing high-temperature trip is adequate. LOPA closes the gap. It assigns initiating event frequency, credits each independent protection layer (BPCS, alarms with operator response, mechanical relief, SIS), and arrives at a residual frequency that is either tolerable or not. If not, the residual frequency gap is the SIL required for the SIS. This semi-quantitative bridge between qualitative HAZOP and engineered SIS is what IEC 61511 mandates · we deliver it to the standard.
CEng MIE India-signed deliverables · LiDAR-powered where applicable · digital twin handover ready · routes to the Risk + Safety + AMC practice lead within 24 hours.
High-severity HAZOP findings extracted as LOPA scenarios. Initiating event + consequence + existing safeguards documented.
Industry-typical frequencies (CCPS, OREDA, your own incident history) assigned. Validated against operating experience.
Each IPL credited per IEC 61511 rules · BPCS (1 only), alarms with operator response (1 if procedure documented + tested), mechanical relief, SIS layers.
Residual frequency computed. Compared to your corporate / regulatory tolerable risk criteria. Gap quantifies SIL requirement.
SIL 0 / 1 / 2 / 3 allocated per scenario. CEng MIE-signed. Feeds directly into SIS specification.
Reports reference the international and national standards your regulators, F500 audit teams, and corporate process safety leads cite. Every deliverable signed by a Chartered Engineer (CEng MIE India).
Three landmark engagements from our verified roster · quantified outcomes, no client names disclosed without written permission.
127 LOPA scenarios. 14 required SIS (mostly SIL 2). SIS gap closed in next turnaround.
Combined HAZOP + LOPA workshop. SIL allocations validated against Aramco SAES guidance. Pre-empted operator-mandated reviews.
Pharma reactor block LOPA · 42 scenarios. SIS sized for 8. Linked to GMP process safety chain.
Tell us your plant, region, and scope · a named Chartered Engineer responds within 24 hours.